In France, a plug-and-play solar kit is not exempt from the grid rules: Enedis states that declaring a self-consumption installation is mandatory, even without injection and whatever the power, through a zero-injection agreement (CACSI). At the same time, a government answer in May 2026 stated that the revised wiring standard NF C 15-100, in force since September 2025, bans connecting a generator to a standard socket, and it announced no derogation. Enedis allows a Consuel waiver for pre-assembled plug-and-play kits, but no primary source we found fixes a numeric power limit.

Key Takeaways

  • Enedis states that declaring a total self-consumption installation is mandatory, even without injection and at any power — a plug-and-play kit is not exempt.
  • The declaration is made by accepting the CACSI, a commitment not to inject into the grid that records your address, installed power and equipment type.
  • Enedis requires a Consuel certificate when electrical work modifies the existing circuit or a battery is added, and allows a waiver for pre-assembled plug-and-play equipment conforming to NF EN 50549-1-4.
  • The revised wiring standard NF C 15-100 (published August 2024, in force September 2025) bans connecting a generator to a standard socket, according to a government answer of 26 May 2026 that announced no derogation.
  • No primary source we reviewed fixes a numeric power limit for plug-in kits: retail guides cite 800 W, 800 VA, 900 W and 3 kWc, which are different quantities.
  • Ask an electrician and your home insurer before connecting a kit, and check your co-ownership rules and local urban plan before fixing panels to a railing or façade.

France has no dedicated balcony-solar law that we could find, and the picture is contradictory: the grid operator Enedis publishes a procedure for plug-and-play kits, while the revised wiring standard NF C 15-100 now restricts plugging a generator into a standard socket. This guide separates what official sources say from what retailers claim.

Balcony Solar in France 2026: Enedis Declaration, Consuel and the NF C 15-100 Problem

What Enedis Requires: CACSI, Consuel and Linky

Enedis states that declaring a total self-consumption installation is mandatory, even without injection, whatever its power. The route for a kit that never exports is the CACSI, which Enedis describes as the document that formalises your commitment not to inject into the grid; it records the installation address, the installed power and the type of equipment. Enedis recommends its online Enedis-Connect portal for the procedure.

A Consuel certificate (electrical conformity check) is required, per Enedis, when electrical work modifies the existing circuit or when a battery is added. Enedis adds that a waiver is possible for plug-and-play equipment that is already assembled and conforms to standard NF EN 50549-1-4. Check that your kit's documentation names that standard.

If your meter is an older non-communicating model, Enedis states that replacing it with a communicating Linky meter is mandatory.

📍 In One Sentence

Enedis requires every self-consumption installation, including a zero-injection plug-and-play kit, to be declared through a CACSI.

💬 In Plain Terms

Even if your kit never sends power to the grid, you still tell Enedis it exists. Enedis recommends doing this online.

📌Note: This section reports Enedis's own published procedure and is not legal advice. Confirm the current wording on enedis.fr before you connect a kit.

The NF C 15-100 Problem: Standard Sockets and Plug-In Kits

A written question in the National Assembly (No. 10336, published 21 October 2025) asked the government whether it would allow a derogation, because the revised wiring standard NF C 15-100 seems to ban connecting individual solar panels through a socket. In its answer published on 26 May 2026, the government confirms the standard was published in August 2024 and entered into force in September 2025, and explains that the ban on connecting a generator to a standard socket rests on two risks: electric shock from exposed live parts and overheating of household conductors that could cause a fire.

The same answer says plug-and-play kits are sold under the manufacturer's responsibility and are not part of the building's fixed electrical installation, since no circuit is created or modified. It refers to the ADEME guide on plug-and-play kits (April 2023), which sets power thresholds not to be exceeded, but the answer does not state the values. It announces no derogation and says the government is working with the sector, Consuel and the network operators, pointing to battery storage as a track.

Photovoltaique.info, a resource site linked to Hespul and the national PV resource centre, describes the same practical risk: a kit plugs into a standard outlet that may not have been designed for that power, so the outlet can be overloaded. We did not verify how binding NF C 15-100 is for a private user. An electrician or your home insurer can tell you how they treat a kit connected to a standard socket.

📍 In One Sentence

The revised NF C 15-100 bans connecting a generator to a standard socket according to the government, and no derogation for plug-and-play kits was announced in May 2026.

💬 In Plain Terms

Enedis has a declaration route for these kits, but the wiring standard says a plain socket is the wrong way to connect one. Both statements are on record, and they have not been reconciled.

⚠️Warning: Do not read the Enedis waiver as approval of socket connection. It removes the Consuel certificate for certified pre-assembled kits; it does not settle the NF C 15-100 question.

The Unconfirmed Power Limit: 800 W, 800 VA, 900 W or 3 kWc

We found no primary source — law, decree, Enedis page or government answer — that states a numeric power limit for plug-in kits in France. Retail and installer guides cite four figures: 800 W, 800 VA, 900 W per circuit and 3 kWc. They measure different things (panel power, inverter output, injectable power and system size), so they cannot all describe the same limit for the same kit.

The 800 W figure that dominates product pages matches the German Balkonkraftwerk limit. At least one guide describes the 600 W and 800 W "regulatory" limits on French product sheets as market practice transposed from Germany, not a French text. Treat 800 W as a sensible design target, not as a confirmed French legal ceiling; the ADEME guide of April 2023 is the document that sets the thresholds, so read it before choosing a kit.

Building Rules: Town Hall and Co-Ownership

Whether you must tell the town hall depends on where and how the panel is fixed, and we found no primary source that settles it. Retail guides say a panel on a façade or railing can change the building's exterior and call for a prior declaration (déclaration préalable), while a free-standing frame on a private floor is described as lighter. Your local urban plan (PLU) and any protected heritage zone decide.

In a co-owned building, a railing or façade may be a common or regulated element, so check the co-ownership rules and ask the syndic before fixing anything. Tenants need the landlord's consent for fixings. A free-standing frame on a private balcony floor avoids fixing into the railing or façade, but it does not remove the Enedis declaration.

Frequently Asked Questions

Is balcony solar legal in France?

There is no ban on the kit itself, but it is not exempt from the grid rules: Enedis states that declaring any self-consumption installation is mandatory. The wiring standard NF C 15-100 adds a restriction on connecting a generator to a standard socket, and no derogation has been announced.

Do I need to declare a plug-and-play kit to Enedis?

Yes, according to Enedis, whatever the power and even if nothing is injected. The declaration is made by accepting the CACSI, preferably through the Enedis-Connect portal.

What is the CACSI?

The agreement in which you commit not to inject electricity into the grid. It records the installation address, the installed power and the type of equipment.

Do I need a Consuel certificate?

Enedis says Consuel applies when electrical work modifies the existing circuit or a battery is added. A waiver is possible for pre-assembled plug-and-play equipment conforming to NF EN 50549-1-4.

What does NF C 15-100 say about plug-in solar?

According to a government answer of 26 May 2026, the version published in August 2024 and in force since September 2025 bans connecting a generator to a standard socket, because of electric shock and overheating risks. No derogation was announced.

Is there an 800 W limit in France?

It is not confirmed. Retail guides cite 800 W, 800 VA, 900 W and 3 kWc, and we found no primary source fixing one. The ADEME guide of April 2023 sets thresholds, but the values were not quoted in the sources we reviewed.

Do I need a Linky meter?

Enedis states that replacing an older non-communicating meter with a Linky is mandatory.

Can I install it on a rented or co-owned balcony?

You need the landlord's consent for fixings in a rental, and in a co-owned building you should check the co-ownership rules and ask the syndic. A free-standing frame avoids fixing into the railing but not the Enedis declaration.